Construction at the Pickering Go Station. Completion date expected in late 2013. The project involves the construction of a new multi-level parking structure that will accommodate an additional 1500 new parking spaces, with access to the new bridge across Hwy 401 as well as a covered walkway to the station.
Saturday, December 29, 2012
"X"
Construction at the Pickering Go Station. Completion date expected in late 2013. The project involves the construction of a new multi-level parking structure that will accommodate an additional 1500 new parking spaces, with access to the new bridge across Hwy 401 as well as a covered walkway to the station.
Subscribe to:
Post Comments (Atom)
Blog Archive
-
▼
2012
(341)
-
▼
December
(31)
- Baby, It's Cold Outside
- Keeping Warm
- "X"
- You Have Snow
- Gift Surprise
- Boxing Day - December 26
- Today Is Christmas
- Christmas Eve
- First Snow
- Do Something Enjoyable
- Mayan Calendar - BOOM!
- Ready For Destruction
- Signs, Signs - Street
- Christmas Lights
- Trash
- Deep In Thought
- Sunset With Tender Love
- Arva Flour Mill
- Barn And Clouds
- Signs, Signs - Protect The Water
- Santa Christmas Display
- Cheetah
- Sundy Bridges - The View From Down Under
- One Sunrise - Three Views
- Babbling Brook
- Cooper's Hawk?
- Signs - Trains And People: A Deadly Mix
- Christmas Tree
- Jam
- Cows In The Backyard
- Weekly Top Shot- Delta London (Ontario) Armouries ...
-
▼
December
(31)
Just a view you see all days but with a twist in it. I like it Andy.
ReplyDeleteRight on. The X changed everything.
DeleteX marks the spot. Looks like a busy area!
ReplyDeleteVery cool shot.
ReplyDeleteThat's a huge crane on that construction project. At first I thought it was two cranes embracing, but no, just articulated booms. Should be able to build into the sky.
ReplyDeleteI thought the same thing until I walked over and had a look at it.
DeleteGood catch! The red makes it pop.
ReplyDelete